Infrastructure Development at Airbase
Building 1: WO-Log Building which is 48.15m in span by 86.45m length with a height of 5.7m
Building 2: QM Building which is 35.9m in span by 75m Long with a height of 5.7m
Building 3: P & RTC Gymnasium Building which is 27.8m in span and 75m long with a height of 8.1m
Structural Steel
Castellated beams
Thermal insulation
Roofing and side cladding sheets from Nyumba Colourcoat as requested by the client
Side Cladding rails and zed purlins
Trusses frames curved roof for the Squash Courts